The construction has begun at BayTowne Plaza. We're excited to share all of the pictures from beginning to end.

This is the rear of the building, behind the old Tops. The grade has been raised and they are preparing it for a large green space. It will also serve as an open area for restaurants.

This is one angle on the old Tops building. They are currently preparing the inside for a street of shops.

Follow the double yellow line! They will be cutting a hole right through the old Tops and there will be shops on your right and on your left. The road will come out the other side of the building to the open area shown in the first picture.

Another angle on the old Tops. Notice how the area to the left has been refaced.